Main Main types of activities Administrative and management Staff Chief Engineer Service Enterprise Structure
Technical Water Supply Department

Technical Water Supply Department

   Commissioning, Start-Up and Experimental works
   of direct-flow, reversible and combined systems of technical
   water supply, including pressurized and non-pressurized tracts
   of technical water supply, circulation pumps.

   Warranty, operational and other types of tests of pumps of
   systems technical and circulation water supply, various types of coolers,
   including tower and fan cooling towers, splash pools.

   Development of modes of economic vacuum of condensing units.

   Mathematical modeling and calculations of cooling capacity with
   optimization of the operation of various types of water coolers with
   their compatible operation (parallel, serial or parallel-serial).

   Compilation and review of water use and drainage regulations.

   Basic project regarding water coolers of technical
   systems water supply.

   Development of working and technical projects for reconstruction or
   repair of the technological and construction part of cooling towers,
   splash pools.

   Adjusting the operation of ball cleaning systems of turbine condensers.

         Volodymyr BORYSYUK, head of the TWS department
       mob.: +38 (067) 67218 27 e-mail: vborusyuk@techenergo.org.ua